Monday 30 November 2009

Weekend @ The Zenith Factory 2

Tonight the moulds came out of the oven and bags after the second stage on Sunday. The UHM unidirectional carbon spars laid in, 93g carbon reinforcement and the inside layer of 25g glass cloth. A sheet of peel ply was placed on top of the moulds to soak any excess resin and prepare the surfaces ready for joining together, as when you peel it off (very carefully) when it comes out of the bags it leaves a rough wax free surface to ensure a good bond when joining together.

Also my new fus showing off the colour of my new model.















No comments: