Wednesday, 31 December 2008
The Crack
What no crasher! To busy flying? He needs all the practice he can get if he doesn't want his arse whooped by the mighty Chalster AGAIN!!!!
Fus Moulding and other bits
Had a spare day so started work on a Fus, ballast tube, joiner boxes and joiner. As you can see from the photos there is a number of diffent mould part required to make these parts. parts will be moulded in the new oven at approx 150 degrees C for one hour. All Part made from pre peg. Trying a new layup for the fus using large amount of UD.
Friday, 19 December 2008
Wednesday, 17 December 2008
Up to temperature and off we go!
Last night I added the internal fans to the oven, they were wired to run continuously and made a massive difference, the oven got to temperature much quicker and stayed there for longer when the lights went off.
The oven was tested at 30 degrees then ramped up to 50 degrees, which took no effort really, there is plenty of room for higher temperatures for the future if needed.
Perfect!!!.... the plan is to make a tailplane this weekend to test every process, as some of the building techniques are slightly different to before. Check all the equipment at each stage is functioning as it should, then head down and get on with knocking some of these beauties out!!
The oven was tested at 30 degrees then ramped up to 50 degrees, which took no effort really, there is plenty of room for higher temperatures for the future if needed.
Perfect!!!.... the plan is to make a tailplane this weekend to test every process, as some of the building techniques are slightly different to before. Check all the equipment at each stage is functioning as it should, then head down and get on with knocking some of these beauties out!!
Sunday, 14 December 2008
At Last We Are Ready!!